For the last six months before launch, run a four-week rhythm six times: a big startup party, a team night, a round of team-hosted home parties, and another team night. Six big parties put about 1,200 cards in your hands, which means about 50 follow-ups a week, every week, until launch Sunday.
Two seasons, two jobs
The twelve months before launch Sunday split into two halves. In the first half you build the core. In the second half you ramp. Same goal the whole year: grow the team and grow the money. What changes is the size of the room and the size of your follow-up stack.
| Months 12 to 7 | Months 6 to 1 | |
|---|---|---|
| Parties | Kitchen table and living room, every week | One big startup party and a round of team-hosted home parties a month |
| Cards | A few at each home | About 200 a month, about 1,200 in all |
| Your asks each week | About 10 | About 50 |
Most planters get surprised by the second column. Let’s walk through both, so you see it coming.
Months 12 to 7: build the core
Run kitchen-table parties every week: three or four couples around your table, the vision, then the ask. Move up to living-room parties of 20 to 30 as homes open up. Your team gathers weekly. Call it about ten sit-down asks a week.
It’s steady work, and it builds the people who will serve at every big party later. Lock in that weekly team gathering early. People who say yes at your table are still attending another church, and the team night is where they stop attending somewhere else and start belonging here. Ask every new team member to start tithing now and to bring a friend to the next party.
Months 6 to 1: the four-week rhythm
For the final six months, your calendar runs on a repeating four-week rhythm. You run it six times.
| Week | What happens | Who’s there |
|---|---|---|
| 1 | Big startup party | Your team serving, plus everyone they and your ads can bring |
| 2 | Team gathering | Your team, plus everyone who marked I’m in at the big party |
| 3 | Home parties, hosted by team members | About 20 to 30 people each: interested people from the big party, plus friends your team brings |
| 4 | Team gathering | Your team, plus everyone who said yes at the home party |
Every week has a job, and every job feeds the next one.
- The big party gives you a stack of cards. At a good one, figure about 200: I’m in, I’m interested, or I’m out but praying for you.
- The in people come straight to the team night in week 2. Don’t make them wait a month.
- The interested people get a mass follow-up and an invitation to one of the week-3 home parties. Several team members host, so together the home parties reach the 100 to 200 interested families a big party turns up. Then you follow up personally, at a coffee shop if you can.
- Home-party yeses come to the team night in week 4.
- Then the cycle starts over with the next big party.
Your team carries a lot of this. At a big party, their ticket in is serving, so you can work the room. At a home party, it’s bringing a couple of friends. That’s how the home parties tap networks you’d never reach on your own. (Startup parties covers the four party tiers and how to fill the big room.)
The load: 50 follow-ups a week
Here’s where the ramp gets real. About 200 cards over four weeks is about 50 follow-ups a week. Next month there’s another party and another 200 cards. The load jumps the week the big parties start, and it stays there for six straight months.
Every card gets a next step:
| Card | Next step |
|---|---|
| I’m in | A personal call or text, and an invite straight to team night |
| I’m interested | The mass follow-up, an invite to a home party, and a coffee |
| I’m out, praying | A thank-you, and an invite to grand opening |
Follow up fast. A card sitting in a stack for two weeks is a card you’ve lost. Two hundred cards is more than you can call alone, so read every in card yourself and make those calls first. Divide the interested stack among your strongest team members for the first touch, and keep the coffees for yourself. Have the whole stack sorted and the first calls made in the week of the party.
That’s why your calendar in those final months is wall to wall: coffee at 7, a lunch, two more coffees in the afternoon, a home party at night. If you aren’t ready for the load, the cards sit in a drawer and the people go cold. Clear your calendar for it now. Move the logo, the website and the branding to the margins until the team and the money are on track.
The math: how 1,200 cards become 150 adults
You don’t need most of the cards to say yes. Work it through:
| Step | The math | Result |
|---|---|---|
| Cards | 6 big parties × about 200 | About 1,200 |
| Sit-down asks to join | One card in four | About 300 |
| New team members | 300 × 50% | About 150 adults |
| Your team at launch | 150 + the core from months 12 to 7 | At or past the top of 125 to 200 |
That’s the 125 to 200 adults a large launch needs. Grand opening runs about two to three times the team, so 150 adults puts you at 300 to 450 people. Aim for about 400. And at a 50% give rate, about half the team is tithing by launch Sunday. On a 150-adult team, that’s roughly 75 people already giving before you open the doors.
If you don’t have a plan, you have a wish. And a wish never comes true, despite what Disney tells you.
Month 1: the last party and the preview services
Month 1 breaks the pattern. Arrange for your lease to start about a month before grand opening. The last big startup party lands about four weeks out, the same week the lease starts. The home parties move up to week 2, and the two team nights become your two preview services, about two weeks and one week out.
Everyone who said yes comes to the previews and serves. A preview service is a full run-through of your Sunday, in the actual launch venue, for your team only. You unbox the gear, test every system, time the setup and teardown, run kids check-in with real children, and get all eight teams working at a high level. Then you debrief the same day and give every problem an owner and a deadline.
Launch Sunday should never be your first full run-through.
Always be asking
The rhythm and the parties put the right people in front of you. The asks are what build the team.
Every one of those 50 follow-ups a week ends with an ask: come to team night, come to the home party, meet me for coffee, join the team. And every yes creates more asks. The day someone joins, you ask them to give. Then you ask them to serve at the next big party and bring a couple of friends to the home party.
Ask everyone, every time. Ask the in to give. Ask the giver to serve. Ask the server to bring a friend. Ask the friend to join. Nobody walks out of a meeting with you without a clear next step.
Block it out this week
Pick your launch Sunday, count back six months, and block out the four-week cycle six times: big party, team night, home parties, team night. Book all six big parties now. In month 1, write the two preview services where the team nights would go. Then count your asks every Friday and compare them to the target: about 10 a week while you build the core, about 50 a week once the ramp starts.